Tuesday, November 25, 2014

Opening Capacity Building 24-11-2014

The Cerimony is opening by ITB,Karvak and Chairman Project LiDAR Timor Leste









MAP
 MOP HO FINANCE (MPS)
 MPRM/IPG.IP
 DNTPSC and ZEEMS
 ADN



Sunday, November 23, 2014

TT Aranka Ba Bandung Atu Tuir Capacity Building 22-11-2014

Technical Team Project LiDAR Timor Leste aranka ba Bandung atu tuir Capacity Building durante Loron sanulu resin rua. Hahu husi 24-11-2014 no remata iha 05-12-2014 no sei fila mai Dili iha dia 06-12-2014.





Saturday, November 22, 2014

Progreso Relatorio Projeto LiDAR

Iha data 17 de Novembro 2014, ekipa Konsultan KARVAK halo inkontru ho Sr. Helder hodi halo diskusaun konaba progero iha parte LiDAR no foto acquisition. Tuir relatorio nebe mak relata husi Konsultan katak ate data Fulan Novembro 2014 atinje ona progreso 57%.


Thursday, November 20, 2014

Wednesday, November 19, 2014

LiDAR Project Data Acquisition 2014-11-18

Swath Line : 37 Line
Swath Foto :2.234 Frame

Swath LiDAR
Foto LiDAR

TT and WG Final Meeting Preparation Capacity Building



Minutes of Meeting
Working Group & Technical Team Final Meeting
Preparation Capacity Building @ Office IPG.IP
18/11/2014
Agenda :
             1.      Intrudusaun Projeto LiDAR
             2.      Konceptu Teknolojia LiDAR
             3.      Aktividades Realizado no Progresso
             4.      Preparasaun Capacity Building

   1.      Introdusaun Projetu LiDAR
Iha loron 11/07/2013 konselhu ministro aprova proposta projetu LiDAR
·         Metodu;
Ø  Teknolojia LiDAR no
Ø  Photogrammetry
   2.      Konseptu LiDAR
Ø  Overlapping 60 %
Ø  Site mapping 40 %
   3.      Aktividades Realizado no Progresso
*      Resultado
§  DTM
§  DSM (Digital Surface Model)
§  DEM
§  CONTOUR, interval 1 Meter
§  PHOTO AERO
§  3D SIMULATION
*      Aplikasaun LiDAR
   4.      Preparasaun  Ekipa TT LiDAR
§  Documentos
1.      Passaporte
2.      Ticket
3.      Karta Nomeasaun
§  Financa & Logistic
1.      PerDiem/MOP
2.      Fasilitas Trainning DItanggung Konsultan
3.      Rute : DILI-DPS-JKT-BNDG ( VIP BUS )
Discusaun
Perguntas e Sugestaun:
v  Senhor Jaime, Land & property: husu atu bele klarifika  orsamento / perdiem nebe mak  sei hetan husi konsultan
v  Senhor Mario Jeronimo, MPS : Perdiem husi Konsultan ne temque iha tanba hre mos hansa training nebe mak oferece husi Jica , peserta training hetan perdiem durante iha Japaun
v  Pak Totok, ADN : Sebagai Owner wajib untuk menanyakan tentang perdiem untuk memastikan.
v  Pak Osorio, IPG; akan segera Mengklarifikasi mengenai Perdiem dengan pihak konsultan melalui Pak Helder Lopes sebagai  Chairman Project
v  Senhor Jose, MAP ; Temque iha klarifikasuan kona ba porcento hira  sei simu iha bandung
v  Jose, IPG : sei duvidas tanba durante serviso hanesan Tt, nunca iha perdiem maibe tanba sa mak  temque iha perdiem wainhira iha training?
*      Pak Totok, ADN:selama pekerjaan teknik tidak ada perdiem karena memang tidak ada dana  untuk itu
*      Senhor Mario Husi MPS, Budget husi Mps lafornese atu fo perdiem  ba teknikal team
v  Senhor Jose, MAP : problema ida tanba sa mak tt cada vez ladun iha hakarak atu halao servico ho diak tanba problema perdiem.
§  Trainning Materi Pertama untuk Engineer Level; tentang Mapping and GPS Survey
§  Materi Kedua Phtogrammetry and Remote Sensing
§  Materi Trainning Ketiga tentang LiDAR
v  Jose, IPG:
1.      Material training nebe barak  sei la fo benefisiu diak ba Tt tanba susar atu bele kapta material barak iha tempo nebe badak
2.      Teknikal team nebe tuir treinamento mai husi instituisaun  nebe lahanesan ho background nebe lahanesan oinsa mak bele kapta ho diak?
*      Senhor Osorio;
v  Temque iha vontade ba material nebe mak ita gosta, temque iha konsepto nebe klaru  atu bele hatene buat balun durante training
v  Solusaun horario treinamento sei lao nafatin tuir ida nebe iha ona  ihe peserta training tenque iha konseptu nebe diak atu nune depois de training bele aplika ho diak iha instituisaun.
v  Senhor Mario Jeronimo, Mps; Oinsa  atu training ne bele fo konstribuisaun maksimu ba instituisaun ida-idak?
*      Senhor Osorio;
v  GPS no digital mapping sei iha training kona ba digital mapping no photogrammetry
v  Ida idak temque iha target ba material nebe mak  importante maibe diak liu atu bele hatene  kona ba material hotu nebe iha.

Naran Nebe Mak Tuir Encontru

  1. Adina Alves (MAP/ALGIS) 
  2. Agustinho P Colo (ZEEMS)
  3. Jose Quintao Amaral Goncalves (MAP/ALGIS)
  4. Ana Bela B. Moniz (IPG.IP)
  5. Jaime Dias Fernandes (DNTPSC)
  6. Ernesto dos Santos (IPG.IP)
  7. Francisca T.P.J. Gliolla (IPG.IP)
  8. Margarida MDGL Soares (MOP)
  9. Jose Ximenes Fernandes (IPG.IP)
  10. Fabiola BL Belo (MOP)
  11. Belmiro Moises (MOP)
  12. Mario Sebastiao da Costa Jeronimo (MPS)
  13. FX Totok Pratowo (ADN)
  14. Osorio Xavier da Costa (IPG.IP)
  15. Inacio Gusmao (IPG.IP)